What building departments in Illinois require
Each county or city sets its own frost depth in Illinois. These are the values their permit handouts and code pages list; yours may differ, so check before you dig.
| Place | Frost depth | Source |
|---|---|---|
| Chicago | 42 inches (3.5 feet) | up.codes |
| Lake County | 42 inches (3.5 feet) | lakecountyil.gov |
| Winnebago County (Rockford area) | 42 inches (3.5 feet) | wincoil.gov |
| Village of Brookfield (Cook County) | 42 inches (3.5 feet) | cms2.revize.com |
| LaSalle County | 42 inches (3.5 feet) | lasallecountyil.gov |
| Village of Bourbonnais (Kankakee County) | 42 inches (3.5 feet) | villageofbourbonnais.com |
| Peoria | 36 inches (3 feet) | peoriagov.org |
Where the number comes from
Illinois has no statewide residential code that sets a frost depth: each county, city or town that adopts a building code fills in its own. That's why the same deck can need deeper footings one town over. (Public Act 103-0510; IRC Table R301.2(1), filled in locally.)
Chicago and every northern Illinois county or village we checked use 42 inches; Peoria, in central Illinois, uses 36. We found no published value for Springfield or southern Illinois.
Winter in Illinois
Averages for Chicago (NOAA 1991–2020 climate normals), the same metro as the Illinois home maintenance checklist.
- 19°F average low in January, the coldest month
- October 20 first 32°F night of fall, on average
- April 20 last 32°F night of spring, on average
- 37 inches of snow a year
The ground freezes from the top down after weeks of cold and thaws late, often weeks after the last frost. Snow on the ground slows it, while a plowed driveway or a bare, windswept yard freezes deeper. Dig and pour footings before the ground freezes: concrete must never go onto frozen soil, which settles when it thaws.
Before you dig
- Call 811 a few days ahead. It's free: utilities mark their buried lines before you dig. In Illinois, that's JULIE / Illinois 811.
- Get the number from your building department. Search its site for a deck or footing handout, or call the permit desk. Ask about the footing size too: the frost depth says how deep, not how wide.
- Measure to the bottom of the footing. From finished grade, after any regrading. The concrete footing sits at the bottom of the hole, so with a 36-inch frost depth the hole itself is at least 36 inches deep.
- Don't skip the inspection. Most towns check the open holes before you pour.
Frost line in nearby states
- Missouri 18 to 36 inches, set locally
- Indiana 24 to 36 inches by county
- Iowa 42 inches, set locally
- Wisconsin 48 inches statewide
- Kentucky 24 to 33 inches by zone
- All 50 states and D.C.
Sources
- Illinois Capital Development Board: Building Codes & Regulations
- 2019 Chicago Building Code (Title 14B) section 1809.5: foundations extend at least 42 inches below final grade
- Chicago: building department
- Lake County: building department
- Winnebago County (Rockford area): building department
- Village of Brookfield (Cook County): building department
- LaSalle County: building department
- Village of Bourbonnais (Kankakee County): building department
- Peoria: building department
- International Code Council, 2021 International Residential Code, Chapter 4 (R403.1.4 and R403.1.4.1)
- NOAA NCEI, U.S. Climate Normals 1991–2020