What building departments in Montana require
Each county or city sets its own frost depth in Montana. These are the values their permit handouts and code pages list; yours may differ, so check before you dig.
| Place | Frost depth | Source |
|---|---|---|
| Billings | 42 inches (3.5 feet) | billingsmt.gov |
| Helena | 42 inches (3.5 feet) | helenamt.gov |
| Missoula County (outside the city) | 36 inches (3 feet) | missoulacounty.build |
| Town of West Yellowstone | 48 inches (4 feet) | westyellowstone.gov |
Where the number comes from
Montana has no statewide residential code that sets a frost depth: each county, city or town that adopts a building code fills in its own. That's why the same deck can need deeper footings one town over. (ARM 24.301.142(9) (state-permitted buildings only); local programs fill in IRC Table R301.2.)
The state's own rule (36 inches for one story, 48 for more) covers only buildings the state permits itself, which doesn't include houses. City and county programs set their own.
Winter in Montana
Averages for Billings (NOAA 1991–2020 climate normals), the same metro as the Montana home maintenance checklist.
- 19°F average low in January, the coldest month
- October 3 first 32°F night of fall, on average
- May 6 last 32°F night of spring, on average
- 52 inches of snow a year
The ground freezes from the top down after weeks of cold and thaws late, often weeks after the last frost. Snow on the ground slows it, while a plowed driveway or a bare, windswept yard freezes deeper. Dig and pour footings before the ground freezes: concrete must never go onto frozen soil, which settles when it thaws.
Before you dig
- Call 811 a few days ahead. It's free: utilities mark their buried lines before you dig. In Montana, that's Montana 811.
- Get the number from your building department. Search its site for a deck or footing handout, or call the permit desk. Ask about the footing size too: the frost depth says how deep, not how wide.
- Measure to the bottom of the footing. From finished grade, after any regrading. The concrete footing sits at the bottom of the hole, so with a 36-inch frost depth the hole itself is at least 36 inches deep.
- Don't skip the inspection. Most towns check the open holes before you pour.
Frost line in nearby states
- Idaho 24 inches, set locally
- Wyoming 34 to 54 inches, set locally
- North Dakota 48 to 54 inches, set locally
- South Dakota 42 inches, set locally
- All 50 states and D.C.
Sources
- Montana DLI Building Codes Program FAQ (quotes ARM 24.301.142(9))
- Billings design criteria
- Helena building code page
- Missoula County Table R301.2 design criteria (PDF)
- West Yellowstone building design criteria (PDF)
- International Code Council, 2021 International Residential Code, Chapter 4 (R403.1.4 and R403.1.4.1)
- NOAA NCEI, U.S. Climate Normals 1991–2020