What building departments in Delaware require
Each county or city sets its own frost depth in Delaware. These are the values their permit handouts and code pages list; yours may differ, so check before you dig.
| Place | Frost depth | Source |
|---|---|---|
| City of Wilmington | 32 inches | wilmingtoncitycouncil.com |
| New Castle County (unincorporated) | 32 inches | library.municode.com |
| Town of Middletown | 32 inches | ecode360.com |
| City of New Castle | 32 inches | ecode360.com |
| Kent County (unincorporated) | 24 inches (2 feet) | ecode360.com |
| Sussex County (unincorporated) | 24 inches (2 feet) | sussexcountyde.gov |
Where the number comes from
Delaware has no statewide residential code that sets a frost depth: each county, city or town that adopts a building code fills in its own. That's why the same deck can need deeper footings one town over. (Each county and city adopts the IRC and fills in Table R301.2(1); New Castle County Code Sec. 6.05.002.)
Northern Delaware, all of New Castle County including Wilmington, uses 32 inches; Kent and Sussex counties use 24.
Winter in Delaware
Averages for Wilmington (NOAA 1991–2020 climate normals), the same metro as the Delaware home maintenance checklist.
- 25°F average low in January, the coldest month
- October 30 first 32°F night of fall, on average
- April 9 last 32°F night of spring, on average
- 18 inches of snow a year
The ground freezes from the top down after weeks of cold and thaws late, often weeks after the last frost. Snow on the ground slows it, while a plowed driveway or a bare, windswept yard freezes deeper. Dig and pour footings before the ground freezes: concrete must never go onto frozen soil, which settles when it thaws.
Before you dig
- Call 811 a few days ahead. It's free: utilities mark their buried lines before you dig. In Delaware, that's Delmarva 811 (Miss Utility of Delmarva).
- Get the number from your building department. Search its site for a deck or footing handout, or call the permit desk. Ask about the footing size too: the frost depth says how deep, not how wide.
- Measure to the bottom of the footing. From finished grade, after any regrading. The concrete footing sits at the bottom of the hole, so with a 36-inch frost depth the hole itself is at least 36 inches deep.
- Don't skip the inspection. Most towns check the open holes before you pour.
Frost line in nearby states
- Maryland 18 to 36 inches, set locally
- Pennsylvania 30 to 48 inches, set locally
- New Jersey 30 to 36 inches by zone
- Virginia 12 to 24 inches, set locally
- District of Columbia 30 inches statewide
- All 50 states and D.C.
Sources
- New Castle County Code Ch. 6, Sec. 6.05.002 (2024 IRC amendments), Table R301.2(1) frost line depth 32"
- Wilmington Sub. 1 to Ord. 19-037, 2018 IRC amendments (32")
- Kent County Residential Code (24")
- Sussex County Additional Code Requirements (24")
- Town of Middletown: building department
- City of New Castle: building department
- International Code Council, 2021 International Residential Code, Chapter 4 (R403.1.4 and R403.1.4.1)
- NOAA NCEI, U.S. Climate Normals 1991–2020