Frost line depth by county
Each county's own number, from its design-criteria table. Towns inside a county can set their own. Measured from finished grade to the bottom of the footing.
| County | Frost depth |
|---|---|
| Allegany | 36 inches (3 feet) |
| Anne Arundel | 30 inches (2.5 feet) |
| Baltimore | 30 inches (2.5 feet) |
| Baltimore City | 30 inches (2.5 feet) |
| Calvert | 24 inches (2 feet) |
| Caroline | 24 inches (2 feet) |
| Carroll | 30 inches (2.5 feet) |
| Cecil | 32 inches |
| Charles | 24 inches (2 feet) |
| Dorchester | 24 inches (2 feet) |
| Frederick | 30 inches (2.5 feet) |
| Garrett | 36 inches (3 feet) |
| Harford | 30 inches (2.5 feet) |
| Howard | 30 inches (2.5 feet) |
| Montgomery | 30 inches (2.5 feet) |
| Prince George's | 30 inches (2.5 feet) |
| Queen Anne's | 24 inches (2 feet) |
| Somerset | 18 inches |
| St. Mary's | 20 inches |
| Talbot | 24 inches (2 feet) |
| Washington | 30 inches (2.5 feet) |
| Wicomico | 18 inches |
| Worcester | 18 inches |
Where the number comes from
The Maryland Building Performance Standards leaves the frost depth for each county or city building department to fill in. That's why the same deck can need deeper footings one town over. (COMAR 09.12.51; each county fills in IRC Table R301.2(1), and the Maryland Department of Labor posts them.)
Western Maryland's mountains (Allegany, Garrett) use 36 inches, central Maryland 30, southern Maryland and the upper Eastern Shore 24, and the lower Eastern Shore 18. Kent County publishes no number, and incorporated towns may have their own.
Winter in Maryland
Averages for Baltimore (NOAA 1991–2020 climate normals), the same metro as the Maryland home maintenance checklist.
- 26°F average low in January, the coldest month
- November 5 first 32°F night of fall, on average
- April 6 last 32°F night of spring, on average
- 19 inches of snow a year
The ground freezes from the top down after weeks of cold and thaws late, often weeks after the last frost. Snow on the ground slows it, while a plowed driveway or a bare, windswept yard freezes deeper. Dig and pour footings before the ground freezes: concrete must never go onto frozen soil, which settles when it thaws.
Before you dig
- Call 811 a few days ahead. It's free: utilities mark their buried lines before you dig. In Maryland, that's Miss Utility of Maryland (811).
- Get the number from your building department. Search its site for a deck or footing handout, or call the permit desk. Ask about the footing size too: the frost depth says how deep, not how wide.
- Measure to the bottom of the footing. From finished grade, after any regrading. The concrete footing sits at the bottom of the hole, so with a 36-inch frost depth the hole itself is at least 36 inches deep.
- Don't skip the inspection. Most towns check the open holes before you pour.
Frost line in nearby states
- Virginia 12 to 24 inches, set locally
- Pennsylvania 30 to 48 inches, set locally
- West Virginia 24 to 32 inches, set locally
- Delaware 24 to 32 inches, set locally
- District of Columbia 30 inches statewide
- All 50 states and D.C.
Sources
- Maryland Dept. of Labor: local codes by county, with each county's filled-in Table R301.2(1)
- Maryland Building Codes Administration (MBPS overview: locals may modify the codes)
- Garrett County 2024 building code ordinance (36 in)
- International Code Council, 2021 International Residential Code, Chapter 4 (R403.1.4 and R403.1.4.1)
- NOAA NCEI, U.S. Climate Normals 1991–2020