What building departments in Maine require
Each county or city sets its own frost depth in Maine. These are the values their permit handouts and code pages list; yours may differ, so check before you dig.
| Place | Frost depth | Source |
|---|---|---|
| City of Portland · a condition on city building permits; the city publishes no table | 48 inches (4 feet) | parcelsfolder.portlandmaine.gov |
| City of Lewiston | 48 inches (4 feet) | lewistonmaine.gov |
| City of Bangor | 60 inches (5 feet) | bangormaine.gov |
| City of Westbrook | 48 inches (4 feet) | westbrookmaine.gov |
| Town of Kennebunk | 48 inches (4 feet) | kennebunkmaine.us |
| Town of Wells | 48 inches (4 feet) | wellstown.org |
| Town of Bar Harbor | 48 inches (4 feet) | barharbormaine.gov |
| City of Brewer | 60 inches (5 feet) | brewermaine.gov |
| Town of Hampden | 60 inches (5 feet) | hampdenmaine.gov |
| Town of Winslow | 60 inches (5 feet) | winslow-me.gov |
Where the number comes from
The Maine Uniform Building and Energy Code leaves the frost depth for each county or city building department to fill in. That's why the same deck can need deeper footings one town over. (16-642 CMR; each enforcing town fills in IRC Table R301.2(1).)
Towns with fewer than 4,000 people may not enforce a building code at all. We found nothing published for South Portland, Augusta, Biddeford, Saco, Scarborough, Brunswick or Sanford.
Winter in Maine
Averages for Portland (NOAA 1991–2020 climate normals), the same metro as the Maine home maintenance checklist.
- 14°F average low in January, the coldest month
- October 2 first 32°F night of fall, on average
- May 1 last 32°F night of spring, on average
- 62 inches of snow a year
The ground freezes from the top down after weeks of cold and thaws late, often weeks after the last frost. Snow on the ground slows it, while a plowed driveway or a bare, windswept yard freezes deeper. Dig and pour footings before the ground freezes: concrete must never go onto frozen soil, which settles when it thaws.
Before you dig
- Call 811 a few days ahead. It's free: utilities mark their buried lines before you dig. In Maine, that's Dig Safe (Maine 811 center).
- Get the number from your building department. Search its site for a deck or footing handout, or call the permit desk. Ask about the footing size too: the frost depth says how deep, not how wide.
- Measure to the bottom of the footing. From finished grade, after any regrading. The concrete footing sits at the bottom of the hole, so with a 36-inch frost depth the hole itself is at least 36 inches deep.
- Don't skip the inspection. Most towns check the open holes before you pour.
Frost line in nearby states
- New Hampshire 48 inches, set locally
- Vermont no state code for houses; 60 inches for public and rental buildings
- Massachusetts 48 inches statewide
- New York 42 to 48 inches, set locally
- Rhode Island 40 inches statewide
- All 50 states and D.C.
Sources
- City of Westbrook Code Enforcement FAQ (4 ft minimum below grade)
- Lewiston Ordinance No. 15-03, IRC design criteria (frost line 4'-0")
- Lewiston accessory building & garage guide (48" min.)
- Kennebunk Code Enforcement FAQ (4 ft)
- Wells deck handout, 2021 IRC (48")
- Bangor Building Codes page (5 ft)
- City of Portland: building department
- Town of Bar Harbor: building department
- City of Brewer: building department
- Town of Hampden: building department
- Town of Winslow: building department
- International Code Council, 2021 International Residential Code, Chapter 4 (R403.1.4 and R403.1.4.1)
- NOAA NCEI, U.S. Climate Normals 1991–2020