What building departments in New York require
Each county or city sets its own frost depth in New York. These are the values their permit handouts and code pages list; yours may differ, so check before you dig.
| Place | Frost depth | Source |
|---|---|---|
| New York City | 48 inches (4 feet) | nyc.gov |
| Syracuse | 42 inches (3.5 feet) | syr.gov |
| City of Kingston (Ulster County) | 48 inches (4 feet) | kingston-ny.gov |
| Town of Ithaca (Tompkins County) | 48 inches (4 feet) | townithacany.gov |
| City of Peekskill (Westchester County) | 42 inches (3.5 feet) | cityofpeekskillny.gov |
| Town of Washington (Dutchess County) | 42 inches (3.5 feet) | washingtonny.org |
| Town of Floyd (Oneida County) | 48 inches (4 feet) | floydny.gov |
Where the number comes from
The Residential Code of New York State leaves the frost depth for each county or city building department to fill in. That's why the same deck can need deeper footings one town over. (RCNYS Table R301.2(1); New York City: NYC Building Code §1809.3.1.)
Each town, village or city building department sets the number, and the ones that publish it use 42 or 48 inches. New York City requires 4 feet. We found no published value for the North Country.
Winter in New York
Averages for New York City (NOAA 1991–2020 climate normals), the same metro as the New York home maintenance checklist.
- 28°F average low in January, the coldest month
- November 21 first 32°F night of fall, on average
- April 1 last 32°F night of spring, on average
- 30 inches of snow a year
The ground freezes from the top down after weeks of cold and thaws late, often weeks after the last frost. Snow on the ground slows it, while a plowed driveway or a bare, windswept yard freezes deeper. Dig and pour footings before the ground freezes: concrete must never go onto frozen soil, which settles when it thaws.
Before you dig
- Call 811 a few days ahead. It's free: utilities mark their buried lines before you dig. In New York, that's UDig NY 811 (all New York except NYC & Long Island).
- Get the number from your building department. Search its site for a deck or footing handout, or call the permit desk. Ask about the footing size too: the frost depth says how deep, not how wide.
- Measure to the bottom of the footing. From finished grade, after any regrading. The concrete footing sits at the bottom of the hole, so with a 36-inch frost depth the hole itself is at least 36 inches deep.
- Don't skip the inspection. Most towns check the open holes before you pour.
Frost line in nearby states
- Pennsylvania 30 to 48 inches, set locally
- Vermont no state code for houses; 60 inches for public and rental buildings
- Connecticut 42 inches statewide
- Massachusetts 48 inches statewide
- New Jersey 30 to 36 inches by zone
- All 50 states and D.C.
Sources
- NYS Department of State Technical Bulletin TB-1009-RCNYS (completing Table R301.2(1))
- NYC 2022 Building Code Chapter 18, §1809.3.1 frost protection (4 ft)
- Syracuse: building department
- City of Kingston (Ulster County): building department
- Town of Ithaca (Tompkins County): building department
- City of Peekskill (Westchester County): building department
- Town of Washington (Dutchess County): building department
- Town of Floyd (Oneida County): building department
- International Code Council, 2021 International Residential Code, Chapter 4 (R403.1.4 and R403.1.4.1)
- NOAA NCEI, U.S. Climate Normals 1991–2020