Where the number comes from
The Massachusetts Residential Code (780 CMR 51.00, Table R301.2) sets the frost depth for the whole state. Your building department applies it, and can require more where the ground calls for it.
One number for the whole state, from the Berkshires to Cape Cod.
Winter in Massachusetts
Averages for Boston (NOAA 1991–2020 climate normals), the same metro as the Massachusetts home maintenance checklist.
- 24°F average low in January, the coldest month
- November 12 first 32°F night of fall, on average
- April 3 last 32°F night of spring, on average
- 49 inches of snow a year
The ground freezes from the top down after weeks of cold and thaws late, often weeks after the last frost. Snow on the ground slows it, while a plowed driveway or a bare, windswept yard freezes deeper. Dig and pour footings before the ground freezes: concrete must never go onto frozen soil, which settles when it thaws.
Before you dig
- Call 811 a few days ahead. It's free: utilities mark their buried lines before you dig. In Massachusetts, that's Dig Safe (MA 811 center).
- Get the number from your building department. Search its site for a deck or footing handout, or call the permit desk. Ask about the footing size too: the frost depth says how deep, not how wide.
- Measure to the bottom of the footing. From finished grade, after any regrading. The concrete footing sits at the bottom of the hole, so with a 36-inch frost depth the hole itself is at least 36 inches deep.
- Don't skip the inspection. Most towns check the open holes before you pour.
Frost line in nearby states
- Connecticut 42 inches statewide
- New Hampshire 48 inches, set locally
- Rhode Island 40 inches statewide
- New York 42 to 48 inches, set locally
- Vermont no state code for houses; 60 inches for public and rental buildings
- All 50 states and D.C.